The way points of this bicycle route:
Start
Left out of Parking Lot
Right
Left
LEFT
RIGHT
Pleasant Hill Rd becomes Alhambra
RIGHT
LEFT
Bear slightly right
RIGHT
LEFT
RIGHT
LEFT
Turn RIGHT before the dirt road
RIGHT thru posts onto packed gravel path.
RIGHT
Straight
RIGHT over it. CHECK VIEW
LEFT
LEFT around POND
LEFT
U-TURN
STRAIGHT
S STRAIGHT
RIGHT
X & Walk bikes down to Haute Stuff Deli
Left
RIGHT
RIGHT
LEFT
LEFT
Right
Bear Right
Right
Right
LEFT
At stop sign, bear slightly left. You will see Coca Cola sign up ahead.
Continue straight onto Vine Hill Way
RIGHT
Straight. Bathrooms in Park on the left
Left
Right
LEFT
Right after bridge over Walnut Creek
Left over bridge before Concord Ave.
Left on trail across bridge.
X at signal
X at Signal
Left
Right over bridge into Heather Farm Park
Bear left off the bike trail
Right
End of ride
Welcome to Bikely, take a step by step tour of this path:
Press Start Tour - then use the navigation buttons below to move along the path.
Walnut Creek Heather Farm to Martinez Waterfront
Tagged with: Recreational, Onroad, Smooth, Offroad, Low traffic, Safe, Scenic, Touring